Siemens Gamesa has secured during October 2017 three new orders from two local IPPs (Independent Power Producers) for the supply of 60 MW in three onshore wind farms in Greece.

Specifically, the company has signed an agreement with a local IPP for the supply of turbines at two different wind farms: 8 units of G114-2.0 MW at the Kali Hitsa wind farm (16 MW), located in the Aetolia-Acarnania region, in the south of the country, and 12 G90-2.0 MW at the Litharoserma wind farm (24 MW), located in the same region.

Additionally, a third project has been awarded by another local IPP to Siemens Gamesa for the supply of 10 turbines of 2 MW (20 MW).

The turbines will be supplied during the second half of 2018 and the company will provide operations and maintenance services at these three wind farms for the next ten years.

Siemens Gamesa has installed close to 500 MW of its turbines in Greece, where it maintains 241 MW.

Siemens Gamesa Renewable Energy SA published this content on 22 November 2017 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 22 November 2017 09:09:10 UTC.

Original documenthttp://www.gamesacorp.com/en/communication/news/siemens-gamesa-delivers-wind-turbines-for-three-projects-in-greece-with-a-total-capacity-of-60-mw.html?idCategoria=0&fechaDesde=&especifica=0&texto=&idSeccion=0&fechaHasta=

Public permalinkhttp://www.publicnow.com/view/1B523DB09F10B0D911E68D9C854F01A81C093A88