Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement.

China Power Clean Energy Development Company Limited 中國電力清潔能源發展有限公司

(incorporated in Hong Kong with limited liability)

(Stock Code: 0735)

VOLUNTARY ANNOUNCEMENT POWER GENERATION FOR THE FIRST HALF OF 2017

China Power Clean Energy Development Company Limited (the "Company") announces that, according to the Company's preliminary statistics, the combined total power generation of the Company and its subsidiaries (collectively the "Group") from 1 January to 30 June 2017 (the "First Half") was 4,659,796.77 MWh, slightly decreased by 10.67% when compared to the same period of 2016.

Since (i) the volume of base power generation allocated by the government at the beginning of the year to Phases I and II of Guangdong Dongguan Project decreased as a result of power market reform in Guangdong Province, (ii) in June 2017, Phases I and II of Guangdong Dongguan Project coordinated with the Guangdong Power Grid and commenced grid maintenance and repair work, and (iii) water flow in Fujian area decreased when compared to the same period last year, affecting the power generated from hydropower projects, the total power generation of the Group in the first half of the year declined when compared to the same period in 2016.

On the other hand, the increase in power generation as a result of (i) the improvement in situation of photovoltaic power curtailment, (ii) the commencement of full operation of photovoltaic projects in Sichuan Panzhihua, Jiangxi Ji'an, Guangdong Dongguan Huimei and Zhejiang Yunhe and (iii) the improvement in situation of wind power curtailment in Phases I to V of Gansu Jiuquan Project and the wind power generated in the Hubei Macheng Chunyangshan Project reduced the extent of the net decline.

A comparison between power generation by the main power generation units of the Group in the First Half of 2017 and that of the same period of 2016 is as follows:

Project Installed Capacity Power Generation for the First Half of 2017 Power Generation for the First Half of 2016 Year-on-year Changes (MW) (MWh) (MWh) (%)

1

Natural Gas Projects

Phase I of Guangdong Dongguan Project

(廣東東莞一期項目)

360.00

413,608.45

477,230.80

-13.33%

2

Phase II of Guangdong Dongguan Project (廣東東莞二期項目)

940.00

1,717,200.76

1,844,186.10

-6.89%

Sub-total of natural gas power projects

1,300.00

2,130,809.21

2,321,416.90

-8.21%

Waste-to-energy Power Projects

3

Yunnan Kunming Project (雲南昆明項目)

30.00

61,869.60

85,588.20

-27.71%

4

Phase I of Hainan Haikou Project (海南海口一期項目)

24.00

74,507.40

83,804.20

-11.09%

5

Phase II of Hainan Haikou Project (海南海口二期項目)

24.00

92,962.80

59,704.20

55.71%

Sub-total of waste-to-energy power projects

78.00

229,339.80

229,096.60

0.11%

Wind Power Projects

6

Phase I of Gansu Jiuquan Project (甘肅酒泉一期項目)

100.50

104,425.43

107,322.60

-2.70%

7

Phase II of Gansu Jiuquan Project (甘肅酒泉二期項目)

49.50

28,392.36

25,624.60

10.80%

8

Phase III of Gansu Jiuquan Project (甘肅酒泉三期項目)

201.00

117,282.63

111,525.00

5.16%

9

Phase IV of Gansu Jiuquan Project (甘肅酒泉四期項目)

100.50

64,515.88

51,485.20

25.31%

10

Phase V of Gansu Jiuquan Project (甘肅酒泉五期項目)

20.00

22,851.96

23,409.80

-2.38%

11

Gansu Anbei Project ( 甘肅安北項目)

49.75

364,635.07

341,818.55

6.68%

Project Installed Capacity for the First Half of 2017 for the First Half of 2016 Year-on-year Changes (MW) (MWh) (MWh) (%)

12

Heilongjiang Hongqi Project (黑龍江紅旗項目)

49.50

33,040.64

48,375.90

-31.70%

13

Heilongjiang Hailang Project (黑龍江海浪項目)

49.75

40,718.47

51,812.40

-21.41%

14

Jiangsu Dafeng Project (江蘇大豐項目)

200.25

141,346.30

143,571.80

-1.55%

15

Inner Mongolia Chayou Zhongqi Project (內蒙古察右中旗項目)

49.50

50,978.28

57,881.20

-11.93%

16

Hubei Macheng Chunyangshan Project1 (湖北麻城純陽山項目)

8.00

10,232.49

-

-

17

German Bönen Project (德國Bönen項目)

8.00

6,424.23

7,533.57

-14.73%

Sub-total of wind power projects

1,437.50

984,843.74

970,360.62

1.49%

Hydro Power Projects

18

Fujian Shaxikou Project (福建沙溪口項目)

300.00

638,677.80

965,822.00

-33.87%

19

Fujian Niutoushan Project (福建牛頭山項目)

115.00

165,632.09

342,617.00

-51.66%

20

Fujian Zhangping Huakou Project (福建漳平華口項目)

36.60

37,104.45

85,120.90

-56.41%

21

Chongqing Meixihe Project (重慶梅溪河項目)

129.00

212,586.00

97,044.00

119.06%

22

Yunnan Yingjiang Hongfu Industrial Project (雲南盈江鴻福實業項目)

64.00

50,231.96

49,439.96

1.60%

23

Yunnan Yingjiang Huimin Project (雲南盈江惠民項目)

6.40

13,951.93

12,770.06

9.26%

Sub-total of hydro power projects

651.00

1,118,184.23

1,552,813.92

-27.99%

Project

Installed Capacity

(MW)

for the First Half of 2017

(MWh)

for the First Half of 2016

(MWh)

Year-on-year

Changes

(%)

Photovoltaic Power Projects

24

Phase I of Gansu Wuwei Project (甘肅武威一期項目)

20.00

16,600.21

21,198.60

-21.69%

25

Phase II of Gansu Wuwei Project (甘肅武威二期項目)

30.00

18,229.42

16,707.70

9.11%

26

Phase I of Gansu Baiyin Project (甘肅白銀一期項目)

20.00

16,978.45

21,548.70

-21.21%

27

Phase II of Gansu Baiyin Project (甘肅白銀二期項目)

30.00

23,591.46

16,954.50

39.15%

28

Phase III of Gansu Baiyin Project (甘肅白銀三期項目)

15.00

12,547.70

7,643.80

64.16%

29

Gansu Guazhou Project (甘肅瓜州項目)

8.00

7,110.42

5,168.30

37.58%

30

Hainan Changjiang Project (海南昌江項目)

20.00

15,135.76

13,777.50

9.86%

31

Yunnan Yuanjiang Project (雲南元江項目)

20.00

14,322.72

14,954.60

-4.23%

32

Fujian Zhangpu Project (福建漳浦項目)

80.00

24,291.33

3,737.50

549.94%

33

Sichuan Panzhihua Project (四川攀枝花項目)

34.32

26,488.24

229.30

11,451.78%

34

Ji'an Project (江西吉安項目)

14.07

6,255.14

-

-

35

Guangdong Dongguan Huimei Project (廣東東莞慧美項目)

0.80

410.89

-

-

36

Zhejiang Yunhe Project (浙江雲和項目)

5.24

2,938.05

-

-

Sub-total of photovoltaic power projects

297.43

184,899.77

121,920.50

51.66%

China Power New Energy Development Co. Ltd. published this content on 21 July 2017 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 21 July 2017 09:39:04 UTC.

Original documenthttp://www.cpne.com.hk/attachment/2017072117320100002869055_en.pdf

Public permalinkhttp://www.publicnow.com/view/C7791B0331B4DC6385103BEB12481E87EB28B801